Final T-Topper Swatch Pattern

FINISHED SWATCH:

Swatch Swatch (folded)

Work Flow Chart:

TTopper1

CO 10 st on size 2 needles.

K 2 ridges (4 rows).

CO 10 st with knit on method.

turn and k to end of row.

CO 10 st with knit on method.

k 3 rows (shoulder)

k 15 st, place remaining 15 st on st holder (this is the neckline).

k 6 rows (neckline).

WITH SECOND BALL OF YARN:

pu the 15 st on the holder and k 6 rows.

Join with the other live st from the neckline.

This is the end of the neckline bifurcation.

k 3 rows (shoulder)

BO 10 st at each end.

k 2 ridges.

BO all st.

Seaming:

knit underarms to hem on left side, knit underarms to hem on right side.

Done and done.

Easy peasy top done.

Advertisements

So... whaddya think?

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s